| Localita – Location – Region |
|
Albania |
Albania |
|
| Tipo / Type/ Typ ( fluente o bacino / river or lake // Fluss oder Stausee ) |
|
River |
River |
|
| Costruzione / Construction / Baujahr |
|
2017-2021 |
2017-2021 |
|
| Potenza massima di concessione/ Power acc. concession / Leistung laut Konzession |
kW |
2300kW |
2000kW |
|
| Potenza massima installata/ max. installed power / max. installierte Leistung |
kW |
2080kW |
1724kW |
|
| Portata mass. concessa / max. water-input / max. zugelassener Einlauf |
Liter/ Sekunde |
1100 l/s |
600 l/s |
|
| Portata media concessa/ medium water-input / mittlerer zugelassener Einlauf |
Liter/ Sekunde |
|
|
|
| Quota opera di presa / Capture altitude / Einlaufhöhe |
ü.d.M. |
1115 m ca |
1440 m ca |
|
| Quota opera di restituzione / Return altitude / Auslaufhöhe |
ü.d.M. |
900 m ca |
1115 m ca |
|
| Salto / Jump / Fallhöhe |
m |
214.90m |
324.76m |
|
| Tipo derivatore / type outflow / Art des Auslaufs |
|
Steal Pipeline |
Steal Pipeline |
|
| Gruppi / groups / (Bau-) – Gruppen |
|
1 |
1 |
|
| Marca e tipo turbine / type turbines / Marke und Art Turbinen |
|
1 pcs vertical Pelton |
1 pcs vertical Pelton |
|
| Scadenza concessione / expiry of concession / Ende der Konzession |
|
2048 |
2048 |
|
| Produzione annua 2021 – Annual production- geschätzte Jahresproduktion |
kWh |
Till Dec 2021 – 12.000.000kWh |
| Produzione annua attesa – Annual production- geschätzte Jahresproduktion |
kWh |
from 2022 – 18.000.000kWh |